Professional ice dam removal serving Chelsea and surrounding areas.
Chelsea’s January leaks have a signature: a two-day thaw-freeze cycle, a triple-decker whose top floor has been warming the roof deck all winter, and a ridge of ice at the eave or parapet holding a pond of meltwater with nowhere to go but through. Flat and low-slope rooflines on the city’s older triples are especially good at this — snow sits, heat rises, the dam grows, and the ceiling under it stains by dinnertime. Ice dam removal in Chelsea is steam work and structure work: the dam removed without harming the roof, the entry traced, the insulation wetted by the leak dried or replaced, and the heat path documented for the permanent fix. Water Damage Pros US removes ice dams across Chelsea and Suffolk County.
| Service | Typical Range | Notes |
|---|---|---|
| Dam removal (roofline) | $600 – $2,000 | Steam, per affected run |
| Dam + interior dry-out | $2,000 – $6,000 | Ceiling/wall assembly drying |
| Dam + insulation rebuild | $4,000 – $12,000 | Top-floor thermal repair |
The dam is a symptom; the roof deck’s temperature is the disease. Steam it off this week and the next storm rebuilds it unless the top floor stops heating the roof. Fix the January leak twice — once on the roofline, once in the attic.
Water Damage Pros US removes ice dams across Chelsea and greater Suffolk County — steam-safe removal, assemblies dried, heat paths mapped for the permanent fix. Call while the melt is still running, not after the plaster sags.
Fast, professional water damage restoration for homes and businesses — extraction, drying, and full repair.
Complete flood cleanup and restoration after rising water, storms, and overflow.
24/7 water extraction with truck-mounted pumps to remove standing water fast and limit damage.
Full structural repair and reconstruction after water damage — drywall, floors, and framing.
Detailed moisture inspection and assessment with thermal imaging to find hidden water damage.
Cut out, replace, and repaint water-damaged drywall so walls look new again.
Heat escapes the top floor into an under-insulated roof deck, melting snow that refreezes at the cold eave or parapet edge — the dam holds the next melt against the roof, and flat low-slope assemblies pond and leak under it.
No — picks and shovels tear membrane and shingles that the ice was holding down. Low-pressure steam is the safe method; it removes the dam without adding a roofing claim to the water claim.
Catch the water, take photos, and call — we remove the dam, trace the entry, and dry the assembly. Never put a heater in the attic to 'melt it out'; that's a fire risk and it worsens the melt.
It stops the current leak. The permanent fix is the stack above — insulation and air-sealing on the top floor that keeps heat out of the roof deck. We map and document that work.
During cold snaps we run 24/7 emergency routes — an active January leak gets dam removal and interior stabilization the same day where access allows.
Our certified technicians respond fast, assess the damage, and give you a clear plan — with no obligation and no up-front cost.